{"id":2866,"date":"2026-03-12T17:37:24","date_gmt":"2026-03-12T17:37:24","guid":{"rendered":"https:\/\/economicowl.com\/?p=2866"},"modified":"2026-03-12T17:37:24","modified_gmt":"2026-03-12T17:37:24","slug":"amazon-oregon-sunstone-solar-battery-project-morrow-county","status":"publish","type":"post","link":"https:\/\/economicowl.com\/?p=2866","title":{"rendered":"Amazon Nears Control of Major Oregon Solar and Battery Project"},"content":{"rendered":"\n<p>Amazon has moved closer to becoming the owner behind what could be the largest proposed solar and battery storage development in Oregon, a project that could eventually support growing electricity demand in the state\u2019s east. The company won a high-profile bankruptcy auction with an <strong>$83 million<\/strong> bid and has since acquired the project site, but it still faces key state regulatory steps before construction can move forward.<\/p>\n\n\n\n<p>The proposed development, known as the <strong>Sunstone Solar Project<\/strong>, is planned for private land in <strong>Morrow County<\/strong>. The solar portion is designed at <strong>1,200 megawatts<\/strong>, paired with up to <strong>7,200 megawatts<\/strong> of battery storage capacity. On high-output days, the solar array could generate enough electricity to power about <strong>300,000<\/strong> average households, based on the project\u2019s stated expectations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Bankruptcy Sale Put the Project in Play<\/h2>\n\n\n\n<p>Sunstone was originally proposed by <strong>Pine Gate Renewables<\/strong>, a North Carolina-based developer that started siting and permitting work in Oregon in <strong>May 2022<\/strong>. In <strong>November 2024<\/strong>, the <strong>Oregon Energy Facility Siting Council<\/strong> issued a site certificate for the project, advancing it through one of the state\u2019s major approvals for large energy facilities.<\/p>\n\n\n\n<p>But Pine Gate later filed for bankruptcy, pointing to <strong>project delays<\/strong> and <strong>cost overruns<\/strong>. The bankruptcy auction drew attention because Amazon outbid regional utility interest. One competing bidder, <strong>Puget Sound Energy<\/strong>, exited after bidding <strong>$82 million<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Regulatory Transfer Is the Next Hurdle<\/h2>\n\n\n\n<p>Even with the acquisition, Amazon cannot proceed unless state regulators approve a transfer of the project\u2019s site certificate. The Oregon Department of Energy has said it has been in contact with the developer about the transfer process since the bankruptcy filing period. Under the process described by state officials, the current certificate holder and the prospective new owner would need to file a joint request for a transfer, which would then be reviewed and approved by the siting council.<\/p>\n\n\n\n<p>State officials have indicated that a transfer review could take roughly <strong>three to six months<\/strong>. Regulators have also stressed that ownership alone does not change the state\u2019s requirements. Any new owner would need to comply with the existing certificate conditions, and the entity currently holding the certificate remains the only one authorized to build until a transfer is formally approved.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tax Credit Timing and a Construction Deadline<\/h2>\n\n\n\n<p>The timeline may be shaped by shifting federal renewable energy incentives. Changes under the <strong>One Big Beautiful Bill Act (HR-1)<\/strong> tightened deadlines around how developers qualify for solar and wind tax credits, which can represent a significant portion of total project costs for large-scale builds. With shorter windows and higher pressure to hit milestones, financing and scheduling can become more difficult for projects that are not already moving smoothly.<\/p>\n\n\n\n<p>Oregon\u2019s siting certificate also comes with a key time constraint. State officials have said construction must begin by <strong>November 18, 2027<\/strong>, or the certificate expires, effectively ending the current approval.<\/p>\n\n\n\n<p>Amazon has not publicly detailed how it plans to use the power from the project if it clears the remaining approvals. The company already has multiple large data center developments in Morrow County, but state siting officials have noted that end users of generated power are not typically part of the council\u2019s evaluation process.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Amazon has moved closer to becoming the owner behind what could be the largest proposed solar and battery storage development in Oregon, a project that could eventually support growing electricity demand in the state\u2019s east. The company won a high-profile bankruptcy auction with an $83 million bid and has since acquired the project site, but [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":2867,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[113],"tags":[974,1010,1015,1012,1013,1017,1018,1011,1016,1014],"tmauthors":[129],"ppma_author":[117],"class_list":{"0":"post-2866","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-energy","8":"tag-amazon","9":"tag-battery-storage","10":"tag-data-centers","11":"tag-energy-policy","12":"tag-morrow-county","13":"tag-oregon","14":"tag-permitting","15":"tag-renewable-energy","16":"tag-solar-power","17":"tag-tax-credits"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Amazon Nears Control of Major Oregon Solar and Battery Project - Economic Owl<\/title>\n<meta name=\"description\" content=\"mazon is moving closer to controlling Oregon\u2019s largest proposed solar and battery storage project after winning a bankruptcy auction, but state certificate transfer approvals and shifting federal tax credit deadlines could shape the timeline.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/economicowl.com\/?p=2866\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Amazon Nears Control of Major Oregon Solar and Battery Project - Economic Owl\" \/>\n<meta property=\"og:description\" content=\"mazon is moving closer to controlling Oregon\u2019s largest proposed solar and battery storage project after winning a bankruptcy auction, but state certificate transfer approvals and shifting federal tax credit deadlines could shape the timeline.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/economicowl.com\/?p=2866\" \/>\n<meta property=\"og:site_name\" content=\"Economic Owl\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-12T17:37:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mark Bennett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Bennett\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/economicowl.com\/?p=2866#article\",\"isPartOf\":{\"@id\":\"https:\/\/economicowl.com\/?p=2866\"},\"author\":{\"name\":\"Mark Bennett\",\"@id\":\"https:\/\/economicowl.com\/#\/schema\/person\/7dd76400c83bbbbbd425749e9a2c7827\"},\"headline\":\"Amazon Nears Control of Major Oregon Solar and Battery Project\",\"datePublished\":\"2026-03-12T17:37:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/economicowl.com\/?p=2866\"},\"wordCount\":532,\"publisher\":{\"@id\":\"https:\/\/economicowl.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/economicowl.com\/?p=2866#primaryimage\"},\"thumbnailUrl\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png\",\"keywords\":[\"Amazon\",\"battery storage\",\"data centers\",\"energy policy\",\"Morrow County\",\"Oregon\",\"permitting\",\"renewable energy\",\"solar power\",\"tax credits\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/economicowl.com\/?p=2866\",\"url\":\"https:\/\/economicowl.com\/?p=2866\",\"name\":\"Amazon Nears Control of Major Oregon Solar and Battery Project - Economic Owl\",\"isPartOf\":{\"@id\":\"https:\/\/economicowl.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/economicowl.com\/?p=2866#primaryimage\"},\"image\":{\"@id\":\"https:\/\/economicowl.com\/?p=2866#primaryimage\"},\"thumbnailUrl\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png\",\"datePublished\":\"2026-03-12T17:37:24+00:00\",\"description\":\"mazon is moving closer to controlling Oregon\u2019s largest proposed solar and battery storage project after winning a bankruptcy auction, but state certificate transfer approvals and shifting federal tax credit deadlines could shape the timeline.\",\"breadcrumb\":{\"@id\":\"https:\/\/economicowl.com\/?p=2866#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/economicowl.com\/?p=2866\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/economicowl.com\/?p=2866#primaryimage\",\"url\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png\",\"contentUrl\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png\",\"width\":1200,\"height\":800,\"caption\":\"amazon-nears-control-of-major-oregon-solar-and-battery-project\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/economicowl.com\/?p=2866#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/economicowl.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Amazon Nears Control of Major Oregon Solar and Battery Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/economicowl.com\/#website\",\"url\":\"https:\/\/economicowl.com\/\",\"name\":\"Economic Owl\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/economicowl.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/economicowl.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/economicowl.com\/#organization\",\"name\":\"Economic Owl\",\"url\":\"https:\/\/economicowl.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/economicowl.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Economic-Owl.png\",\"contentUrl\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Economic-Owl.png\",\"width\":800,\"height\":150,\"caption\":\"Economic Owl\"},\"image\":{\"@id\":\"https:\/\/economicowl.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/economicowl.com\/#\/schema\/person\/7dd76400c83bbbbbd425749e9a2c7827\",\"name\":\"Mark Bennett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/economicowl.com\/#\/schema\/person\/image\/ae619da9d0601d37f37533647ebbd1ed\",\"url\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Mark-Bennett.png\",\"contentUrl\":\"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Mark-Bennett.png\",\"caption\":\"Mark Bennett\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Amazon Nears Control of Major Oregon Solar and Battery Project - Economic Owl","description":"mazon is moving closer to controlling Oregon\u2019s largest proposed solar and battery storage project after winning a bankruptcy auction, but state certificate transfer approvals and shifting federal tax credit deadlines could shape the timeline.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/economicowl.com\/?p=2866","og_locale":"en_US","og_type":"article","og_title":"Amazon Nears Control of Major Oregon Solar and Battery Project - Economic Owl","og_description":"mazon is moving closer to controlling Oregon\u2019s largest proposed solar and battery storage project after winning a bankruptcy auction, but state certificate transfer approvals and shifting federal tax credit deadlines could shape the timeline.","og_url":"https:\/\/economicowl.com\/?p=2866","og_site_name":"Economic Owl","article_published_time":"2026-03-12T17:37:24+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png","type":"image\/png"}],"author":"Mark Bennett","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mark Bennett","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/economicowl.com\/?p=2866#article","isPartOf":{"@id":"https:\/\/economicowl.com\/?p=2866"},"author":{"name":"Mark Bennett","@id":"https:\/\/economicowl.com\/#\/schema\/person\/7dd76400c83bbbbbd425749e9a2c7827"},"headline":"Amazon Nears Control of Major Oregon Solar and Battery Project","datePublished":"2026-03-12T17:37:24+00:00","mainEntityOfPage":{"@id":"https:\/\/economicowl.com\/?p=2866"},"wordCount":532,"publisher":{"@id":"https:\/\/economicowl.com\/#organization"},"image":{"@id":"https:\/\/economicowl.com\/?p=2866#primaryimage"},"thumbnailUrl":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png","keywords":["Amazon","battery storage","data centers","energy policy","Morrow County","Oregon","permitting","renewable energy","solar power","tax credits"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/economicowl.com\/?p=2866","url":"https:\/\/economicowl.com\/?p=2866","name":"Amazon Nears Control of Major Oregon Solar and Battery Project - Economic Owl","isPartOf":{"@id":"https:\/\/economicowl.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/economicowl.com\/?p=2866#primaryimage"},"image":{"@id":"https:\/\/economicowl.com\/?p=2866#primaryimage"},"thumbnailUrl":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png","datePublished":"2026-03-12T17:37:24+00:00","description":"mazon is moving closer to controlling Oregon\u2019s largest proposed solar and battery storage project after winning a bankruptcy auction, but state certificate transfer approvals and shifting federal tax credit deadlines could shape the timeline.","breadcrumb":{"@id":"https:\/\/economicowl.com\/?p=2866#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/economicowl.com\/?p=2866"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicowl.com\/?p=2866#primaryimage","url":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png","contentUrl":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/03\/Amazon-Nears-Control-of-Major-Oregon-Solar-and-Battery-Project.png","width":1200,"height":800,"caption":"amazon-nears-control-of-major-oregon-solar-and-battery-project"},{"@type":"BreadcrumbList","@id":"https:\/\/economicowl.com\/?p=2866#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/economicowl.com\/"},{"@type":"ListItem","position":2,"name":"Amazon Nears Control of Major Oregon Solar and Battery Project"}]},{"@type":"WebSite","@id":"https:\/\/economicowl.com\/#website","url":"https:\/\/economicowl.com\/","name":"Economic Owl","description":"","publisher":{"@id":"https:\/\/economicowl.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/economicowl.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/economicowl.com\/#organization","name":"Economic Owl","url":"https:\/\/economicowl.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicowl.com\/#\/schema\/logo\/image\/","url":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Economic-Owl.png","contentUrl":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Economic-Owl.png","width":800,"height":150,"caption":"Economic Owl"},"image":{"@id":"https:\/\/economicowl.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/economicowl.com\/#\/schema\/person\/7dd76400c83bbbbbd425749e9a2c7827","name":"Mark Bennett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/economicowl.com\/#\/schema\/person\/image\/ae619da9d0601d37f37533647ebbd1ed","url":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Mark-Bennett.png","contentUrl":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Mark-Bennett.png","caption":"Mark Bennett"}}]}},"authors":[{"term_id":117,"user_id":5,"is_guest":0,"slug":"nox9nxrxn9n9xny9x2ny9","display_name":"Mark Bennett","avatar_url":{"url":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Mark-Bennett.png","url2x":"https:\/\/economicowl.com\/wp-content\/uploads\/2026\/02\/Mark-Bennett.png"},"0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/economicowl.com\/index.php?rest_route=\/wp\/v2\/posts\/2866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/economicowl.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/economicowl.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/economicowl.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/economicowl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2866"}],"version-history":[{"count":1,"href":"https:\/\/economicowl.com\/index.php?rest_route=\/wp\/v2\/posts\/2866\/revisions"}],"predecessor-version":[{"id":2868,"href":"https:\/\/economicowl.com\/index.php?rest_route=\/wp\/v2\/posts\/2866\/revisions\/2868"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/economicowl.com\/index.php?rest_route=\/wp\/v2\/media\/2867"}],"wp:attachment":[{"href":"https:\/\/economicowl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/economicowl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/economicowl.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2866"},{"taxonomy":"tmauthors","embeddable":true,"href":"https:\/\/economicowl.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftmauthors&post=2866"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/economicowl.com\/index.php?rest_route=%2Fwp%2Fv2%2Fppma_author&post=2866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}